London’s ‘Super Sewer’ Now Fully Operational, Transforming the Thames

After a decade of construction and an investment of £5 billion, London’s super sewer is now fully operational, marking a significant milestone in the city’s efforts to protect the River Thames from pollution. Officially known as the Thames Tideway Tunnel, this 25-kilometre-long engineering marvel stretches from Acton in the west to Abbey Mills near Stratford in the east, where it connects with the existing Lee Tunnel.
The final connection was completed on 14 February 2025, when the last of 21 valves along the tunnel’s route was activated. This development enables the system to intercept sewage overflows that have long plagued the Thames, diverting waste to treatment facilities and significantly improving the river’s water quality. Notable connection points include Putney Embankment, Victoria Bridge, and Greenwich.
The Thames Tideway Tunnel is designed to address the limitations of London’s aging Victorian sewer system, which has struggled to cope with the demands of a growing population and increased rainfall due to climate change. Historically, heavy rains would overwhelm the system, leading to untreated sewage discharges into the river. According to Thames Tideway, with the new tunnel in place, it’s anticipated that 95% of these spills will be prevented. In fact, during a single 24-hour period of heavy rain, the system has already prevented 5.5 million tonnes of sewage from entering the Thames.
Andy Mitchell, CEO of Tideway, the company behind the project, expressed optimism about the tunnel’s impact: “Our mission has always been about creating not just a tunnel, but a healthier, thriving environment for the river and its inhabitants. We look forward to seeing a real impact in the years to come and sharing everything we learn about the positive changes.”
The activation process began in October 2024, with the first four valves coming online. A ceremonial event marked the occasion, featuring the placement of a massive concrete lid over a shaft in east London. Now, with all valves operational, the system is undergoing testing to ensure it can handle extreme weather conditions, such as the increasingly frequent storms affecting the capital.
London Mayor Sadiq Khan highlighted the project’s significance on social media, stating,
“I’m determined to make our rivers cleaner so we can continue to build a greener city.”
While the Thames may not yet be ready for open water swimming enthusiasts, the river’s improved protection means residents can take comfort in knowing that their waste is being properly managed, reducing the environmental impact on this iconic waterway.
For more updates on the Thames Tideway Tunnel and further insights into London’s environmental initiatives, visit EyeOnLondon.
[Image Credit: Thames Tideway]
Follow us on:
Subscribe to our YouTube channel for the latest videos and updates!
We value your thoughts! Share your feedback and help us make EyeOnLondon even better!